Master Plan for Dong Ha City
Client: PMU for GMS Corridor Towns Development | Duration: June 2017 – November 2018 | Location: Vietnam | Associated Consultants: Nippon Koei Vietnam
Client: PMU for GMS Corridor Towns Development | Duration: June 2017 – November 2018 | Location: Vietnam | Associated Consultants: Nippon Koei Vietnam
About: The key objective of this assignment is to adjust the Dong Ha Urban Master Plan to 2030, and Vision for 2050, based on harnessing the advantages of the strategic location of Dong Ha City, maximizing all available development potential and minimizing negative impacts on the economy, environment, and social cohesion.
The 2030 development plan and 2050 development vision are guided by:
Specific tasks included: