GIS Technology-based Management for Power Transmission Grid
Client: EVNNPT | Duration: November 19 2018 – Ongoing | Location: Vietnam
Client: EVNNPT | Duration: November 19 2018 – Ongoing | Location: Vietnam
NPT’s goal is to deploy an Enterprise-GIS is for managing and operating the transmission grid at present, as well as to facilitate the planning, building, and operating smart transmission in the age of Industry 4.0. The project is designed to provide direction to the use of “GIS technology-based technical management for power transmission grid” for the National Power Transmission Corporation. Its implementation will cover (i) NPT’s headquarter; (ii) PTCs, PMBs, and NPTS’s office; (iii) Operation management centers, related teams of PTCs, PMBs, and NPTS; and (iv) 220-500kV substations and transmission lines managed by PTCs.
The overall goal of the project design and implementation is to enable the National Power Transmission Corporation (NPT), a member of Electricity of Vietnam (EVN), to deploy a Geographic Information System (GIS) over NPTs service territory.
Specific tasks include: